J.S.O Environmental leaf logo J.S.O Environmental
Residential overheating analysis

TM59 Overheating Assessments for better summer comfort.

Dynamic thermal modelling for new homes and residential developments, identifying overheating risks while practical design changes are still available.

Architects Developers Planning teams Residential design
overheating assessment
The service

Understand overheating risk before the design reaches site.

TM59 uses dynamic thermal modelling to assess how homes are likely to perform during warmer weather. It considers building form, occupancy, glazing, ventilation, solar gains and internal heat gains.

Where risk is identified, we assess appropriate measures such as shading, glazing changes and ventilation strategies to help improve summer comfort.

✓

Dynamic thermal modelling against TM59 criteria

✓

Assessment of solar gains and overheating risk

✓

Testing of practical mitigation measures

✓

Clear results to support planning and design decisions

Need help?

Not sure exactly what you need?

Send us your drawings, planning information or building control requirements and we can confirm the right assessment for your project.

Who it is for

The right overheating assessment for the right project.

DESIGN TEAM

Architects

Test building design, glazing and shading strategies while changes can still be made efficiently.

DEVELOPMENT

Residential developers

Understand overheating risk across new homes and apartment schemes before construction progresses.

PLANNING

Planning consultants

Provide clear evidence where overheating assessment forms part of the planning requirements.

PROJECT STAGE

Planning to technical design

Assess overheating risk while the design, specification and mitigation measures can still be changed.

What we assess

The factors that shape summer temperatures.

We assess the building and its proposed systems to understand overheating risk and identify where design changes may improve summer comfort.

✓

Geometry and orientation

✓

Glazing and solar gains

✓

External and internal shading

✓

Natural and mechanical ventilation

✓

Fabric and thermal mass

✓

Occupancy and internal gains

✓

Risk against TM59 criteria

How we work

A clear process from design to assessment.

01
Step 01

Review the design

We review the proposed building, orientation, glazing, shading and ventilation strategy.

02
Step 02

Build the model

We model the proposed building, including its form, fabric, glazing and ventilation.

03
Step 03

Test mitigation

We assess overheating risk and test practical measures where improvements are needed.

04
Step 04

Issue the report

We document the findings, results and recommended design measures clearly for the project team.

What you receive

Clear results for your project team.

✓

Dynamic thermal model and scope

✓

TM59 results for assessed spaces

✓

Identification of overheating risk

✓

Tested mitigation recommendations

✓

Clear assessment report and findings

Not sure whether you need a TM59 assessment?

Send us your plans or project information and we can help determine whether an overheating assessment is required and what the assessment should cover.

FAQs

Common questions

What is a TM59 assessment?

TM59 is a recognised methodology for assessing overheating risk in residential buildings using dynamic thermal modelling. It considers factors such as solar gains, ventilation, occupancy and internal heat gains.

What is the difference between TM59 and Part O?

Part O sets requirements for mitigating overheating risk in new residential buildings, while TM59 provides a recognised modelling methodology for assessing whether a dwelling is likely to overheat.

What happens if the design does not meet the criteria?

Where overheating risk is identified, we can assess practical mitigation measures such as shading, glazing and ventilation strategies to help improve the design.

When should the assessment be completed?

Ideally, overheating risk should be assessed while the design is still being developed. This allows mitigation measures to be considered before the specification and building design become difficult to change.