J.S.O Environmental leaf logo J.S.O Environmental
Building regulations compliance

Extension SAP Calculations for altered homes.

SAP calculations for home extensions where proposed glazing or other design choices need additional Part L evidence to demonstrate compliance.

Homeowners Architects Designers Extensions
house extension
The service

Demonstrate compliance when an extension falls outside the standard route.

Extensions can require SAP calculations where new glazing exceeds the usual limits or building control asks for additional energy evidence. A whole-building calculation compares the proposal with a compliant reference case.

This can provide design flexibility while showing that improvements elsewhere in the home balance the proposal.

✓

Existing building and proposed extension assessed

✓

Extension fabric and U-values reviewed

✓

Glazing and proposed systems assessed

✓

Clear evidence for building control

Need help?

Not sure exactly what you need?

Send us your drawings, planning information or building control requirements and we can confirm the right assessment for your project.

Who it is for

The right support at the right project stage.

HOME PROJECT

Homeowners

For extensions where high-level glazing, layout or design choices need additional energy evidence.

DESIGN

Architects and designers

Compare practical compliance options while developing the extension and specification.

APPROVAL

Building control

Provide clear Part L evidence where the standard compliance route is not appropriate.

PROJECT STAGE

Technical design

Assess before building and make changes while the design and specification can still be adjusted.

What we assess

The home, extension and compensating measures.

✓

Existing building construction

✓

Extension fabric and U-values

✓

Existing and proposed glazing

✓

Heating and hot water

✓

Ventilation requirements

✓

Compensating improvements

✓

Whole-home energy performance

How we work

A clear process from information to issue.

01
Step 01

Review the proposal

We review the existing building, proposed extension and available design information.

02
Step 02

Model both cases

We compare the design with a compliant reference case to understand the energy impact.

03
Step 03

Test the options

We assess practical improvements where changes are needed to demonstrate compliance.

04
Step 04

Issue the evidence

You receive the calculation and supporting information needed for building control.

What you receive

Clear outputs for your project team.

✓

Existing and proposed SAP assessment

✓

Reference-case comparison

✓

Part L compliance evidence

✓

Recommended compensating measures

✓

Clear calculation output for building control

Not sure whether your extension needs a SAP calculation?

Send us your plans or project information and we can help determine the right assessment and evidence for your extension.

FAQs

Common questions

When does an extension need SAP?

Depending on the size, glazing and design of an extension, building control may require a whole-dwelling assessment to demonstrate compliance with Part L.

What is an overglazing calculation?

An overglazing calculation can be used where the proposed extension includes more glazing than the standard compliance route allows. The calculation considers the whole dwelling and identifies whether the additional glazing can be balanced by improvements elsewhere.

Can SAP help retain large areas of glazing?

Potentially. A whole-dwelling calculation can compare the proposed design with a compliant reference case and identify practical improvements that may allow the proposed glazing arrangement to be retained.

What information do you need?

We typically need the existing and proposed plans, elevations, construction information, glazing details and details of the heating, hot water and ventilation systems where available.