J.S.O Environmental leaf logo J.S.O Environmental
Construction and on-site testing

Air Pressure Testing for building compliance.

Air pressure testing for residential projects, assessing air permeability and providing the evidence needed to support Building Regulations compliance and completion.

Housebuilders Developers Contractors New homes
Air Pressure Testing
The service

Test air permeability before completion.

Air pressure testing, also known as air tightness testing, measures how much uncontrolled air passes through the building envelope. It provides a clear result on the airtightness achieved by the completed building.

We carry out testing at the appropriate stage of construction and provide the results needed to support Building Regulations compliance and the project's completion requirements.

✓

Air permeability measured

✓

Building envelope tested

✓

Air leakage performance assessed

✓

Clear test results for compliance

Need help?

Not sure exactly what you need?

Send us your project information and we can confirm the right testing requirements and timing for your development.

Who it is for

The right support at the right project stage.

CLIENT TYPE

Housebuilders

Coordinate air pressure testing across new homes and developments before completion and handover.

CLIENT TYPE

Property developers

Arrange testing and manage the evidence needed to support building compliance across residential projects.

PROJECT TYPE

New-build homes

Assess the airtightness of completed dwellings and identify potential air leakage before handover.

PROJECT STAGE

Construction and handover

Carry out testing once the building is sufficiently complete and ready for assessment.

What we assess

Building airtightness and air permeability.

✓

Building envelope and external fabric

✓

Air leakage through the building fabric

✓

Windows, doors and other openings

✓

Junctions and potential leakage points

✓

Overall air permeability performance

✓

Test results for compliance records

How it works

A straightforward process from preparation to results.

01 STEP ONE

Review the project

We review the building type, construction programme and testing requirements to confirm what is needed.

02 STEP TWO

Prepare for testing

We confirm the building is sufficiently complete and ready for an accurate air pressure test.

03 STEP THREE

Carry out the test

We carry out the air pressure test and measure the building's air permeability performance.

04 STEP FOUR

Issue the results

We provide the test results and relevant documentation for the project and compliance records.

What you receive

Clear results and evidence for your project.

✓

Air pressure test

✓

Recorded air permeability result

✓

Test results and documentation

✓

Clear evidence for compliance records

Ready to arrange your air pressure test?

Send us your project information and we can confirm the testing requirements and arrange the right stage for your development.

FAQs

Common questions

When should air pressure testing take place?

Testing should take place when the building is sufficiently complete for the result to represent the finished construction, while there is still an opportunity to address significant air leakage.

What does an air pressure test measure?

An air pressure test measures the air permeability of the building and helps identify how much uncontrolled air leakage is occurring through the building envelope.

What happens if the test identifies air leakage?

The results can help identify areas that may require further investigation or remedial work before the project reaches completion.

Can you test individual homes within a development?

Yes. Testing can be arranged for individual dwellings or coordinated across multiple homes within a wider residential development.