J.S.O Environmental leaf logo J.S.O Environmental
Completion and handover

As-Built SAPs & EPC Lodgement for completed homes.

Final SAP calculations and EPC lodgement using as-built information to confirm the completed dwelling meets the required energy performance standards.

Housebuilders Developers Contractors New homes
The service

Turn the completed build into the final energy evidence.

As-built SAP calculations reflect the dwelling as it has actually been constructed, taking account of the final fabric, heating, hot water, ventilation and renewable technologies installed.

We use the completed information to finalise the SAP assessment and arrange EPC lodgement, providing the documentation needed for completion and handover.

✓

As-built construction information reviewed

✓

Final fabric and specifications assessed

✓

Installed systems and renewables incorporated

✓

Final SAP and EPC evidence provided

Need help?

Not sure exactly what you need?

Send us your project information and as-built details and we can confirm what is needed for the final SAP and EPC.

Get a quote → 📞 0330 043 9275
Who it is for

The right support at the right project stage.

CLIENT TYPE

Housebuilders

Complete the final SAP and EPC requirements across individual homes and larger residential developments.

CLIENT TYPE

Property developers

Coordinate final energy performance evidence as developments move towards completion and handover.

PROJECT TYPE

New-build homes

Finalise the energy assessment using the construction details and systems actually installed.

PROJECT STAGE

Completion and handover

Complete the final SAP assessment and EPC process once the dwelling has been constructed.

What we assess

The completed dwelling and its final specification.

✓

As-built construction and floor areas

✓

Final insulation and building fabric

✓

Windows, doors and glazing

✓

Heating and hot water systems

✓

Ventilation systems and controls

✓

Renewable technologies and energy performance

✓

Final SAP and EPC requirements

How it works

A clear process from as-built information to EPC.

01 STEP ONE

Gather the information

We review the final drawings, specifications and information showing how the dwelling has been constructed.

02 STEP TWO

Update the model

We update the SAP assessment to reflect the final fabric, systems and renewable technologies installed.

03 STEP THREE

Complete the assessment

We check the completed model and confirm the final energy performance of the dwelling.

04 STEP FOUR

Lodge the EPC

We finalise the required documentation and arrange EPC lodgement for the completed dwelling.

What you receive

Clear final evidence for completion and handover.

✓

As-built SAP calculation

✓

Final energy performance assessment

✓

EPC lodgement

✓

Completion and compliance documentation

Ready to complete your SAP and EPC?

Send us your as-built information and we can confirm what is needed to finalise the assessment and EPC lodgement.

FAQs

Common questions

What is an as-built SAP calculation?

An as-built SAP calculation reflects the dwelling as it has actually been constructed, using the final building fabric, systems and specifications rather than the original design assumptions.

When is an as-built SAP required?

The final SAP assessment is completed once the dwelling has been constructed and the information needed to confirm the final specification is available.

What information do you need?

Useful information can include final drawings, construction specifications, insulation details, windows and doors, heating and hot water systems, ventilation information and details of renewable technologies installed.

Can you arrange the EPC lodgement as well?

Yes. Once the final SAP assessment has been completed, we can arrange the EPC lodgement for the completed dwelling.