Technical Design RIBA 4

The calculations behind building control sign-off.

Planning is granted, drawings are developing and building control needs the technical evidence. We support SAP, SBEM, Part L, Part O, U-values, PSI values and related calculations, keeping them consistent with what was committed to at planning stage.

Part L compliance supported through SAP or SBEM
Part O overheating assessed at design stage
U-values and PSI values matched to the fabric build-up
Design changes tracked against planning-stage commitments

Not sure if this is the right stage? If you have planning permission and are now working through building control, technical design or construction drawings, this is usually the right phase.

Ask what is needed
What we cover

SAP, SBEM and building control calculations

The modelling and calculations building control expects at RIBA Stage 4, coordinated with the SAP or SBEM headline model and the wider technical design.

Design-stage compliance

Consistent, cross-referenced, lodged.

laptop showing calculations on desk
Behind the numbers

Calculations based on the design being built.

SAP and SBEM calculations need to reflect the actual specification, not a generic assumption. We work from the drawings, fabric details and services information so the model aligns with the design as it develops.

  • Inputs checked against drawings and specifications
  • Design changes reviewed and modelled clearly
  • Technical outputs kept aligned with planning-stage commitments
Deliverables

What you receive at technical design.

SAP or SBEM output reports, design-stage
Part L compliance summary
Part O overheating assessment report
U-value calculation pack
PSI value calculation pack
Condensation risk analysis
TM54 operational energy model where relevant
BREEAM evidence coordination where required
FAQs

Common questions

Do you re-use our planning-stage energy statement?

Yes, where suitable. The Stage 3 Energy Statement sets the targets and assumptions. At Stage 4, the SAP or SBEM model tests whether the developing design still aligns with those commitments.

How does Part O differ from TM59?

Part O is the Building Regulations route for overheating in residential buildings. TM59 is a dynamic modelling method often required for more complex schemes or planning-stage assessments.

Can you support design changes after building control comments?

Yes. We can review the comments, update calculations where needed and help the design team understand the impact of specification changes.

Do you provide both SAP and SBEM calculations?

Yes. SAP is used for domestic projects and SBEM is used for non-domestic buildings. We can advise which route applies once we understand the project type and scope.